RGCE provides an on-call City Engineer, City Inspection, and District Engineer services to a number of jurisdictions in the capacity of Staff City or District Engineer. Professional services are provided on an on-call and project-by-project basis. Services include streets, water and wastewater, storm water management, construction administration and inspection, service plans, budget preparation, plan reviews, and master planning.
PARKER, COLORADO
- Prepared site applications for wastewater plant lift station and effluent irrigation sites
- Water and sewer usage and tap fee study
- 1.1 mgd Wastewater Treatment Plant with slow rate land application system and 37 million gallon effluent storage reservoir
- 5,000 gpm, three-pump water booster pump station (system sized for ultimate 8,000 gpm)
- 2.5 and 3.6 mg buried water storage tank
- Several miles of water and sewer mains ranging from 8 to 24 inches
- Computerized water network analysis
- Computerized operations and maintenance reporting system
- Plan review and inspection of subdivision developments
- Computerized District growth and financial projections
- District service plan, including rate structures
- 2,000 gpm manganese green sand water filter plant
- 11 deep well pumping and transmission systems
- 1.1 mgd advanced wastewater treatment (AWT) plant
- Water and Sewer Rate Study
- 0.864 mgd sewage lift station
- 0.10 mgd sewage lift station
PARKER, COLORADO
- Prepared site applications for wastewater treatment plants and effluent irrigation sites
- 1 MGD AWT facility design, O&M manual, and operator training
- Master Water and Sewer Plan
- 2,275 gpm - ten-well collection, wellhouse, and treatment system
- 500,000 gpd Wastewater Treatment Plant expansion with land application system and two 50 mg effluent storage reservoirs
- Two (2) 600 gpm multi-completion wells, wellhouse, and treatment system
- District-wide central telemetry system for two wastewater treatment plants, two water storage tanks, two water pump stations, three sewage pump stations, and ten wells
- 2,100 gpm, four-pump booster pump station
- 2.0 and 1.0 mg underground water storage tanks
- Design and construction administration of various water and sewer mains ranging from 8 to 30 inches
- Computerized water network analysis of District water system
- Plan review and inspection of over 30 subdivisions
- Water Rate Study
- 3.0 mg underground post-tensioned concrete water storage tank
- 11 miles of 30"
, 24", 20", and 16" water transmission lines
- Future water sources studies
- Representative on Cherry Creek Reservoir Clean Lakes Task Force
- 200 ac.-ft. effluent storage reservoir, 1.0 mile 12" effluent force main
- 1991 Highway 83 Utility Crossing Improvements, including design and construction management of 653 feet of 12" water and sewer lines installed in 24" diameter casing pipe, and 150 feet of 36" casing across Highway 83
- 2 mgd AWT facility design including ultraviolet disinfection
- Design and construction administration for a 12" nested within a 24" Parshall flume for wastewater flow measurement
- Design of chemical storage area including tank for concentrated sulfuric acid storage
- 5.2 miles of 30" to 18" sanitary sewer effluent lines
- 4 miles of 36" to 12" sanitary sewer interceptor lines with combination pipeline/bridge creek crossing
WESTMINSTER, COLORADO
- Capital Improvement Advisor - serving on a staff level and providing the City with on-call engineering services
- Water Distribution Model - Debugging the City's existing hydraulic distribution model.
- Program Management for the following projects:
- Design/build new water booster pump station
- 88th and Zuni sewage lift station
- 95th Avenue sewage lift station replacement
- Big Dry Creek parallel sewer interceptor
- 6 MGD tertiary treatment, storage, and distribution system
- U.S. 36/Tennyson St. sewer replacement
- Big Dry Creek WWTP, hydraulic study
- 92nd Avenue water main replacement
- Design and construction observation for 1.9 mgd sewage lift station, force main, and Insituform lining of 1,600 LF of A.C.P.
- Project manager for design/build of a 15 mgd, 23 million dollar water treatment plant
ADAMS COUNTY, COLORADO
- 6 miles of 18" - 30" water lines
- 2.5 miles of sanitary sewer lines
- 1 miles of sewer force main
AURORA, COLORADO
Design of water distribution system and sanitary sewer collection, treatment and disposal system for 11,000 gpd for the Aurora Reservoir recreational facility (formerly called SENAC Reservoir)
BLACK HAWK, COLORADO
- 0.5 mgd activated sludge wastewater treatment plant
- Eight (8) miles of sewer lines
- Sewage treatment plant upgrade to 1.0 mgd
- Sewer rate study
- District Engineering Services
- Sanitary interceptor replacement to increase hydraulic capacity
BROOMFIELD, COLORADO
- 15,000 L.F. of 24", 18", and 12" waterline
- 0.33 and 0.21 mgd sewage lift stations
- 5,500 L.F. of 8" force main
- 14,000 L.F. of 12" through 27" Sanitary Sewer Interceptor lines
DOUGLAS COUNTY, COLORADO
Design and construction administration of SCADA installation for District-wide water system
1990 Infrastructure Improvements - Design and construction administration for 7,800 feet of 12" and 15" diameter sanitary interceptor sewer. The design included a capacity analysis for the future construction of a large residential development.
Big Dry Creek Interceptor - Design and construction administration for 5,000 feet of 20" diameter sanitary interceptor sewer. The design included a capacity analysis for future residential developments.
Marcy Gulch Interceptor - Design and construction administration for 17,000 feet of 15" and 30" diameter sanitary interceptor sewer.
MAZATLAN, MEXICO
Site investigation and process design evaluation of a partially constructed 1.6 mgd wastewater treatment facility for this Mexican resort community. Prepared recommended modifications to increase reliability, reduce operational problems and increase efficiency. Provided cost estimates for the alternatives.
DENVER, COLORADO
Preliminary design analysis and cost estimates for effluent disposal and sanitary sewer treatment at the new airport site. Analyzed feasibility of pumping from Metro Denver Wastewater plant versus on-site treatment for slow rate land application system. For wastewater collection, examined cost of collection for on-site treatment versus pumping to the Metro Denver outfall in 56th Avenue.
DOUGLAS COUNTY, COLORADO
Performed value engineering and construction viability review for the Pinery wastewater treatment facility. The projected savings in construction costs for this facility, as a result of the value engineering review, was $500,000. Performed design services for upgrade of existing booster pump station.
DENVER, COLORADO
Designed 0.45 mgd sewage lift station
EDGEWATER, COLORADO
- Various water and sewer main extensions and replacements
- T.V. analysis of the City's sewer system
- Infiltration analysis of the City's sewer system
- Plan review and inspection of subdivision developments
- Reconstruction of 18-inch sewer outfall line
- City-wide sewer rehabilitation program
- Sliplined rehabilitation of 30" storm sewer
- Replacement of 12" water line in Sheridan Boulevard
- Replacement of 12" water line in 24th Avenue
- Design and construction administration for 2,500 feet of 12" water line replacement in Sheridan Boulevard and 24th Avenue in the City of Edgewater
HUDSON, COLORADO
- construction administration for 40,000 feet of 12" water line
- Well design and modifications to equipment controls
- Developed bid package for SCADA control of water distribution system
KERSEY, COLORADO
Evaluated the water distribution, wastewater collection and treatment, and storm drainage systems. Reviewed results of a T.V. analysis of the sewer system, and coordinated activities for leak detection services and valve inspections on the water distribution system. Developed alternatives and cost estimates for improving wastewater treatment and collection, storm drainage, and water supply.
DENVER, COLORADO
Performed an analysis of the plant water system over a 75-acre wastewater treatment site. Study included a steady state network analysis of the system, with fire hydrant tests to verify model and to refine estimates of pipe friction factors. In addition, a surge analysis was performed on the system, simulating a power failure to the pumps and opening and closing of existing valves. The system was modeled with a variety of surge control devices to determine what would provide adequate surge suppression to the system. The surge analysis was performed with the University of Kentucky Surge IV computer program.
PARKER, COLORADO
Performed value engineering for 2.0 mgd activated sludge wastewater treatment plant. An extensive review was conducted to determine the most effective and efficient design, and a construction viability review was performed to assure that the design could be constructed with no undue problems. The value engineering study resulted in a savings of approximately $1 million. Provided troubleshooting and inspection services during construction.
DOUGLAS COUNTY, COLORADO
500 gpm green sand iron removal water treatment plant and pump station
GREENWOOD VILLAGE, COLORADO
- Rehabilitation of 3,200 feet of concrete sewer and 38 manholes
- Replacement of 4,200 feet of sewer
- Installation of 3,000 feet of 12" waterline
STERLING, COLORADO
- Design and construction administration of 8,000 feet of 18", 12", and 10" water main, and 3,200 feet of sanitary sewer
- Design and construction administration of a 1,200 gpm water booster pump station
THORNTON, COLORADO
- 30" water line replacement
- 1.4 mgd sanitary sewer lift station
- Water treatment plant overflow system
- Re-route of potable water storage overflow line
- Raw water influent valve and vault modification
- Design of 10' Parshall flume for raw water flow measurement
TRINIDAD, COLORADO
- Design of .5 mgd wastewater treatment plant expansion to an existing 1.5 mgd facility. Facilities included preliminary treatment, aeration, clarification, digestion, ultraviolet disinfection, sludge dewatering, composting, and an operations building.
- 13,200 feet of sewer interceptor design and lift station in steep terrain
WINDSOR, COLORADO
Prepared a master plan for water, sewer and storm sewer facilities. Based on existing population and population projections, the cost and timing of capital improvements, including trunk lines and treatment facilities, was developed.
PARACHUTE, COLORADO
Site selection, preliminary design/engineering study and site application for .27 mgd wastewater treatment plant.
ALMA, COLORADO
Design of a 300 gpm water treatment plant.